Skip to content
Wiki/routines/Intermediate Strength Routine
routines 7 min read

Intermediate Strength Routine

Four days built around the squat, bench, deadlift and overhead press, with a four week wave progression for when linear gains have ended.

Last updated: 6 September 2026

Overview

Four days, built on the squat, bench press, deadlift and overhead press, progressing across four week waves rather than session to session.

This is the routine for when adding weight every session has stopped working but you still want strength to be the priority. Accessories exist here to support the main lifts, not to fill time.

Quick Answer

An intermediate strength routine trains the squat, bench press, deadlift and overhead press across four sessions per week, progressing in four week waves of rising intensity followed by a deload, rather than adding weight every session.

Key Points

  • Four main lifts, one per session as the priority.
  • Four week waves: build for three, deload on the fourth.
  • Percentages are based on a training max, not a true max.
  • Accessories fix specific sticking points.
  • Estimated maxes replace frequent max testing.

Set your training max

Do not use your true one rep max. Use 90 percent of it, called a training max, so the percentages remain achievable on bad days.

If you do not know your max, estimate it from a recent set, then take 90 percent.

ExampleValue
Estimated squat 1RM140kg
Training max, 90 percent126kg
Round down to125kg

The four week wave

WeekMain lift setsIntensity
14 x 575 percent of training max
24 x 480 percent
35 x 385 percent
43 x 560 percent, deload

At the end of each wave, add 2.5kg to the upper body training maxes and 5kg to the lower body training maxes, then run it again.

The week

DayMain lift
MondaySquat
TuesdayBench press
ThursdayDeadlift
FridayOverhead press

Day 1: Squat

ExerciseSetsReps
Back squatPer wavePer wave
Romanian deadlift38
Leg press312
Pallof press310 each
Calf raise312

Day 2: Bench press

Day 3: Deadlift

Day 4: Overhead press

ExerciseSetsReps
Overhead pressPer wavePer wave
Pull up46 to 8
Dip310
Lateral raise315
Barbell curl310

Worked example

Squat training max of 125kg.

WeekPrescriptionWeight
14 x 5 at 75 percent95kg
24 x 4 at 80 percent100kg
35 x 3 at 85 percent105kg
43 x 5 at 60 percent75kg

Next wave, training max becomes 130kg and the whole table shifts up.

How To Deadlift: Starting Strength 5 Step Deadlift by Alan Thrall (Untamed Strength), on YouTube. Embedded with no tracking cookies until you press play.

Accessories that fix sticking points

ProblemAccessory to prioritise
Bench stalls at lockoutClose grip bench, triceps pushdown
Bench stalls off the chestPaused bench, incline dumbbell press
Squat depth collapsesFront squat, core work
Deadlift slow off the floorDeficit pulls, leg press
Deadlift stalls at lockoutHip thrust, heavy rows
Press stalls at the sticking pointPin press, lateral raise

When to reset

If you miss the prescribed reps on week 2 or 3 of a wave twice in a row, your training max is too high. Reduce it by 10 percent and rebuild. This is normal and happens to everyone roughly two or three times a year.

Common Mistakes

MistakeWhy it causes problemsBetter approach
Using a true max for percentagesWeek 3 becomes impossibleUse 90 percent as the training max
Skipping the deload weekFatigue accumulates across wavesWeek 4 is part of the programme
Doing accessories before main liftsThe priority gets the leftoversMain lift first, always
Testing a max every monthCosts recovery, tells you littleEstimate from working sets
Adding weight faster than the waveDefeats the structureTrust the progression

Frequently Asked Questions

Do I need to test my max to start?

No. Estimate it from a recent hard set of five, then take 90 percent as your training max.

Can I add hypertrophy work?

The accessories already provide some. If you want more, add two isolation exercises per session, but not at the cost of the main lift quality.

How long can I run this?

Three or four waves, so twelve to sixteen weeks, then reassess with a heavy single or a new estimate.

Should I squat and deadlift on consecutive days?

No. Keep at least one day between them, which is why the layout puts squats on Monday and deadlifts on Thursday.

Sources

National Strength and Conditioning Association - https://www.nsca.com/

American College of Sports Medicine - https://acsm.org/

strength routinepowerlifting programmeintermediate strength training

Spotted an error or want to improve this article? Sign in to suggest a change